Sustainability
Cleaner utilities engineered into the plant
Water, fuel and power are treated as design parameters — not afterthoughts — across the Amravati facility.
0 KL/day
Effluent Treatment Plant
0 ML
CETP capacity
0.0 MW
Rooftop solar power
0%
Power requirement met by solar (approx.)
Approach
Four areas of continuous reduction
Water
A 1000 KL/day effluent treatment plant and 5.0 ML CETP support a zero liquid discharge process across wet processing.
Fuel
A multi-fuel utility runs on rice husk, bagasse and briquette cleaner-fuel options to lower the thermal footprint.
Power
0.8 MW of rooftop solar generation meets nearly half of the plant's power requirement.
Materials
Recycled and bio-based fibre routes are available across performance and athleisure programmes.
Initiatives
Commitments in operation today
- Zero Liquid Discharge process
- Multi-fuel utility
- Rice husk / bagasse / briquette cleaner-fuel options
- Solar power meeting nearly half of power requirements
